NMC Library
Image from Google Jackets

Brown Bridge Dam failure report.

By: Publisher: [Lansing MI] : Michigan Department of Environmental Quality, June 2014Description: v, 15 pages; 9 unnumbered appendices : charts, illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Other title:
  • Brown Bridge Dam : temporary dewatering structure : root cause analysis of the October 6, 2012, failure incident [Cover title]
  • The report on the root cause analysis of the October 6, 2012, failure incident at Brown Bridge Dam : temporary dewatering structure (TDS)
Subject(s): LOC classification:
  • HT393 .M5 B76 2014
Online resources:
Contents:
Preface -- Executive Summary -- Authority -- Methodology -- Project Description -- About the Failure Event -- Failure Modes Considered -- Summary of Field Data Analyses -- Probable Failure Model -- Conclusions -- References. Appendix A Post-Failure Field Interviews. Appendix B Drawings and Figures. Appendix C 2012 Soil Boring Data. Appendix D Historic Soil Borings and Construction Plans. Appendix E Detailed Seepage Analysis. Appendix F Post Failure Survey Data. Appendix G Headwater and Tailwater Readings. Appendix H TDS Sheetpile Data. Appendix I TDS Failure Investigation Daily Logs.

Preface -- Executive Summary -- Authority -- Methodology -- Project Description -- About the Failure Event -- Failure Modes Considered -- Summary of Field Data Analyses -- Probable Failure Model -- Conclusions -- References. Appendix A Post-Failure Field Interviews. Appendix B Drawings and Figures. Appendix C 2012 Soil Boring Data. Appendix D Historic Soil Borings and Construction Plans. Appendix E Detailed Seepage Analysis. Appendix F Post Failure Survey Data. Appendix G Headwater and Tailwater Readings. Appendix H TDS Sheetpile Data. Appendix I TDS Failure Investigation Daily Logs.

There are no comments on this title.

to post a comment.

Powered by Koha