Brown Bridge Dam failure report.
Publisher: [Lansing MI] : Michigan Department of Environmental Quality, June 2014Description: v, 15 pages; 9 unnumbered appendices : charts, illustrations ; 28 cmContent type:- text
- unmediated
- volume
- Brown Bridge Dam : temporary dewatering structure : root cause analysis of the October 6, 2012, failure incident [Cover title]
- The report on the root cause analysis of the October 6, 2012, failure incident at Brown Bridge Dam : temporary dewatering structure (TDS)
- HT393 .M5 B76 2014
Item type | Current library | Shelving location | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|
Reference book | NMC Library | Reference | HT393 .M5 B76 2014 (Browse shelf(Opens below)) | 1 | Not for loan | 33039001296424 |
Preface -- Executive Summary -- Authority -- Methodology -- Project Description -- About the Failure Event -- Failure Modes Considered -- Summary of Field Data Analyses -- Probable Failure Model -- Conclusions -- References. Appendix A Post-Failure Field Interviews. Appendix B Drawings and Figures. Appendix C 2012 Soil Boring Data. Appendix D Historic Soil Borings and Construction Plans. Appendix E Detailed Seepage Analysis. Appendix F Post Failure Survey Data. Appendix G Headwater and Tailwater Readings. Appendix H TDS Sheetpile Data. Appendix I TDS Failure Investigation Daily Logs.
There are no comments on this title.