000 | 01837cam a2200301 i 4500 | ||
---|---|---|---|
003 | MiTN | ||
005 | 20190729105445.0 | ||
008 | 130912s2014 001 0 eng u | ||
040 |
_aMiTN _beng _erda _cMiTN |
||
050 | 4 |
_aHT393 .M5 _bB76 2014 |
|
110 | 1 |
_aMichigan. _bDepartment of Environmental Quality. |
|
245 | 1 | 0 | _aBrown Bridge Dam failure report. |
246 | 1 | 4 |
_aBrown Bridge Dam : _btemporary dewatering structure : root cause analysis of the October 6, 2012, failure incident. |
246 | 3 | 3 | _aThe report on the root cause analysis of the October 6, 2012, failure incident at Brown Bridge Dam : temporary dewatering structure (TDS) |
264 | 1 |
_a[Lansing MI] : _bMichigan Department of Environmental Quality, _cJune 2014. |
|
300 |
_av, 15 pages; 9 unnumbered appendices : _bcharts, illustrations ; _c28 cm |
||
336 |
_atext _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
505 | _aPreface -- Executive Summary -- Authority -- Methodology -- Project Description -- About the Failure Event -- Failure Modes Considered -- Summary of Field Data Analyses -- Probable Failure Model -- Conclusions -- References. Appendix A Post-Failure Field Interviews. Appendix B Drawings and Figures. Appendix C 2012 Soil Boring Data. Appendix D Historic Soil Borings and Construction Plans. Appendix E Detailed Seepage Analysis. Appendix F Post Failure Survey Data. Appendix G Headwater and Tailwater Readings. Appendix H TDS Sheetpile Data. Appendix I TDS Failure Investigation Daily Logs. | ||
650 | 0 |
_aDams _xEnvironmental aspects _zMichigan. |
|
650 | 0 |
_aDam failures _zMichigan _zBoardman River. |
|
651 | 4 | _aBoardman River (Mich.) | |
856 | 4 | 0 |
_uhttp://michigan.gov/deq/0,4561,7-135-3313-331769--,00.html _zAvailable online; click to view. |
596 | _a1 | ||
948 | _au379121 | ||
903 | _a27170 | ||
999 |
_c27170 _d27170 |